Facilities

Disaster Robotics Center

  • LocationYoung-il man 3 industrial complex

  • Area19,800㎡

  • Floors3-floor(Laboratory), 1-Floor(Test Facilities)

  • Gross area7,508 ㎡

  • FacilitiesLaboratory, Test Building, Education & Exhibit room etc.

R&D Laboratory

  • A three-story building, 3,950㎡
  • Main facility
    • 1) 1st floor / Community space
    • 2) 2nd floor / Focus R&D laboratory zone
    • 3) 3rd floor / start up & business support(total 10 rooms)
    • 4) seminar room, refresh room, multipurpose room etc

Indoor Test
Facility

  • A three-story building, 2,800㎡
  • Main facility :
    • 1) ISO container based on ASTM standard
      * 10 Basics skill, 5 Buildings access, 15 IED test Available
    • 2) Visual acuity and Field view test
    • 3) Robot heat-resisting test chamber(radiation 500℃)
    • 4) 5T hoist crane/ Open Lab

Obstacle
Test Zone

  • Main Facilities : stairs, ramp, not flat ground, drain, common utility tunnel etc artificial obstacles
  • Specifications
    • 1) stair / under the law / Width : 600mm, 1,200mm, Length : 10m
    • 2) ramp / slope 8%, 17%, Width : 6m, Length : 10m
    • 3) etc

Rough Ground
Test Zone

  • Main Facilities : Test runway with sand, aggregate, mud, rock, water etc
  • Specifications
    • Width : 3.4m, Length :10m

Disaster
Environment
Test Zone

  • Main Facilities : disaster environment building, Rubble pile, steel tower
  • Specifications
    • 2 Floors : 770㎡
    • * Perform the RFP mission and disaster response / Concrete Rubble pile : 100㎡
    • * Robot performance evaluation at the collapse site / Flight performance evaluation for UAV